When will scaffolding be inspected

1. After the scaffolding foundation is completed before the frame is erected.
2. After every 6-8m height is erected.
3. Before applying load on the working layer.
4. After reaching the design height or encountering winds or heavy rains of level 6 and above, after the frozen area is thawed.
5. Inactive for more than a month