1. During the erection process, the scaffolding must be erected according to the prescribed structural plan and size. Its size and plan cannot be changed privately in the middle. If the plan must be changed, it needs the signature of a professional responsible person.
2. During the erection process, the safety of the process must be ensured. The staff who are erecting need to wear relevant safety helmets and safety belts.
3. If there are unqualified rods or fasteners of poor quality, they must not be used reluctantly. Reluctant use will bring great safety hazards to the later erection process. In addition, if the length of the shoulder is loose, it cannot be used reluctantly.
4. After the erection, the vertical deviation of the rod must be corrected in time to avoid excessive deviation. There is no way to use it again, and it is necessary to spend manpower again, which is very troublesome.
5. When the scaffolding is not completed, after finishing work every day, make sure that it is stable and no accidents will happen. Warning measures must be taken around to let others know that there is scaffolding here and it is forbidden to approach.
6. When re-erecting or continuing to erect scaffolding on the second day, make sure to check whether the scaffolding is stable. Only after checking that it is stable can it be erected the next day.
7. During the erection process, the outside must be hung with a safety filter. The bottom of the filter must be firmly tied to the pole, and the distance between the fixed points must not be greater than 500 mm.