- The scaffolding construction operation surface must be fully covered with scaffolding boards, and the distance from the wall must not exceed 20cm. There must be no gaps, probe boards, or flying boards;
- A guardrail and a 20cm high footboard should be installed on the outside of the operation surface;
- When the distance between the inner pole and the building is greater than 150mm, it must be closed;
- A horizontal safety net must be installed when the clearance distance below the scaffolding construction layer operation surface exceeds 3.0m. When the horizontal net between the inner opening of the double-row frame and the outer wall of the structure cannot be protected, scaffolding boards can be laid;
- The frame must be closed along the inner side of the outer frame with a dense safety net. The safety nets must be firmly connected, tightly closed, and fixed to the frame.