1. Determine the design plan: Carry out specific designs according to the project requirements and site conditions to ensure that the design plan meets the requirements of safety, stability, and economy.
2. Prepare materials and tools: including qualified I-beam steel beams, coupler-type steel pipe scaffolding and its accessories, as well as necessary construction machinery and equipment such as wrenches and electric drills. The materials can only be used after quality inspection and confirmation that they meet the design requirements. At the same time, conduct on-site inspections and ensure that the site is flat and solid without water accumulation and other factors that affect construction safety.
3. Locate and position: Locate and position according to the design requirements, pop up the axis position line on the ground, and use the ink fountain to pop up the horizontal elevation control line and verticality control line as the reference point for erection. Mark the horizontal lines and pole spacing control points of the balcony or window positions on each floor with red paint on the exterior wall of the building to facilitate correction and use during subsequent installation.
4. Install the suspension device: including eyebolts, wire rope clips, connecting plates, etc., to ensure that these components are firm reliable, and evenly stressed.
5. Assemble the frame gradually upwards: combine the horizontal and vertical supports and diagonal tie-downs layer by layer from bottom to top to form an integral structure.
6. Deliver for use after acceptance: During the entire process, the operating procedures and safety technical measures must be strictly followed to ensure the safety of personnel and equipment. At the same time, regular inspections and maintenance are also required to ensure that its stability and durability meet the requirements.