The industrial scaffolding budgeting tips revealed

Is the scaffolding project budget giving you a headache? Don’t worry, here are super practical calculation methods to help you easily solve it!

1. Calculation rules
When calculating the internal and external wall scaffolding, don’t forget the door and window openings and the empty circle openings, these are not included in the area.
If the building height is different, remember to calculate it separately according to different heights.
The exterior wall decoration project is not within the scope of the general contract? No problem, just apply the main external scaffolding or decorative external scaffolding project separately!

2. Calculation rules for external scaffolding
The height of the external wall scaffolding is calculated from the designed outdoor floor to the eaves (or parapet top).
Masonry height below 15m? Single-row scaffolding calculation is done!
Height over 15m? Double-row scaffolding to help!
There are also special calculation methods for independent columns and cast-in-place concrete beams and walls!

3. Calculation rules for inner scaffolding
Is the height of the inner wall scaffolding less than 3.6m? Single-row inner scaffolding can do it!
Height more than 3.6m and less than 6m? Double-row inner scaffolding can help!
There are also special calculation methods for lightweight block walls, etc.

4. Calculation rules for decorative scaffolding
Is the inner wall decoration more than 3.6m? Calculate the decorative scaffolding according to the calculation rules for the inner scaffolding!
Is the ceiling decoration surface more than 3.6m away from the designed indoor floor?


Post time: Mar-27-2025