In scaffolding projects, the acceptance link is crucial to ensure safety and quality. The following are key acceptance stages and contents:
1. After the foundation is completed and before the scaffolding is erected: check the soil-bearing capacity to ensure that the foundation is stable.
2. After the first-floor horizontal bar is erected: verify the structural stability to prevent accidents.
3. For each floor height of the working scaffolding: check regularly to ensure the safety of the frame.
4. After the cantilever scaffolding is erected and fixed: check the fixing measures to ensure the stability of the cantilever part.
5. Erect the supporting scaffolding, the height is 2~4 steps or ≤6m: check carefully to ensure that the support is firm.
During acceptance, pay attention to the following:
1. Quality of materials and components: ensure the use of qualified materials.
2. Fixation of the erection site and supporting structural members: check whether the fixing measures are firm.
3. Quality of frame erection: carefully check the frame structure to ensure there are no defects.
4. Technical data: check the special construction plan, product certificate, instruction manual test report, etc.
The safety and quality of the scaffolding project can be effectively guaranteed through careful inspection and acceptance at these stages.