Scaffolding Pipe

Use: Scaffolding is a temporary structure used to support people and material in the construction or repair of buildings and other large structures. Material Storage Racks, Pallets, Hydraulic Platforms, Trusses, Columns, Purlins, Greenhouse, Stands Towers, Agricultural Equipment

Standard: BS 1139, BS1387-1985, EN 39, EN10219, JIS G 3444

Certificate: EN10217, EN10219, API 5L PSL1/ PSL2, API 5CT

Out Diameter: 27mm, 38mm, 42mm, 48.3mm-48.6mm

Wall Thickness: 2.0mm, 2.5mm, 2.75mm, 3.0mm, 3.25mm, 3.85mm, 4.0mm

Length: 5.8m, 6m, 6.4m, 6.5m, 0.3-18m

End: Square cut, Burr removed

Steel Grade: Q195, Q215, Q235, Q345, S235JR, S275JR, STK400, STK500

Surface: Lightly oiled, Hot dip galvanized, Electro galvanized, Black

Packing: Plastic plugs in both ends, Wrapped in waterproof paper or PVC sleeve, and sackcloth with several steel strips Plastic plugs in both ends.

Test: Chemical Component Analysis, Mechanical Properties (Ultimate tensile strength, Yield strength, Elongation), Technical Properties (Flattening Test, Flaring Test, Bending Test, Hardness Test, Blow Test, Impact Test etc), Exterior Size Inspection.

Mill Test Certificate: EN 10204/3.1B

Payment Terms: T/T, L/C

Production Time 7-40 days
Delivery Time 7-40 days
Trade terms: FOB, CFR, CIF
Delivery Detail:Depends on your order quantity.
Packaging Detail: Packing in bundles or for the client’s requirement
Supply Ability: 500 Metric Ton/Metric Tons per Day


Post time: Sep-04-2023


We use cookies to offer a better browsing experience, analyze site traffic, and personalize content. By using this site, you agree to our use of cookies.

Accept