Scaffolding Construction Technology

1. No matter what type of scaffolding is erected, the materials and processing quality of the scaffolding must meet the specified requirements. It is absolutely forbidden to use unqualified materials to erect scaffolding to prevent accidents.
2. General scaffolding must be erected in accordance with the scaffolding safety technical operating regulations. For high-rise scaffolding with a height of more than 15m, there must be design, calculation, detailed drawings, erection plans, approval by the technical person in charge at the next level, and written safety technology. Disclosure, and then can be set up.
3. For dangerous and special shelves such as hanging, picking, hanging, sockets, stacking, etc., they must also be designed and approved. Only when separate safety technical measures are prepared can it be erected.
4. After the construction team accepts the task, they must organize all the staff to carefully understand the special safety construction of the scaffold [3], explain the design of the construction organization and safety technical measures, discuss the erection method, and send skilled and experienced technicians to be responsible for the technical guidance and supervision of the erection. guardianship.
acceptance
After the scaffolding is erected and assembled, it shall be inspected and accepted to confirm that it is qualified before operation can be carried out. The foreman in charge, the leader of the shelf team and the full-time safety technicians should organize the acceptance layer by layer and in the water section, and fill in the acceptance form.