① Check and accept once every three-step scaffolding is erected, and the acceptance should be recorded in writing, and the acceptance and signature procedures should be performed.
② Hang the “scaffold acceptance certificate” after the scaffold has passed the acceptance check before it can be used. The certificate should be hung in a conspicuous place.
③It is forbidden to dismantle the frame components, tie points, and safety protection facilities at will. If adjustments are required, the technical personnel must agree to the construction personnel of the external frame.
④. The support of civil engineering formwork support is forbidden to connect with the outer frame.
⑤ It is forbidden to throw objects outside on scaffolding at high altitudes to prevent falling accidents.
⑥. Scaffolding must be inspected and maintained regularly during use so that the scaffolding is always in a safe and reliable state of use.
Post time: Sep-10-2020