Scaffold steel pipe installation

1. After the construction of the scaffolding foundation is completed, the overall construction work of the scaffolding will be carried out. The standard is: the appearance must be flat

It is horizontal, horizontal, and vertical, and the geometrical figures are consistent. The inside connection is firm and smooth.

2. All the starting poles should be set up vertically and staggered on 1800mm and 3600mm. Avoid the length of the horizontal pole to increase the length, increase the foot

The whole of the hand frame is stable, and the insufficient part of the top is filled with a 1800mm steel pipe.

3. The starting pole is set up first, and then the vertical pole are set up. The standing poles should be kept at a clear distance from 500mm from the building. Parallel The pole extends outwards by a distance between 1000mm to take the position of the pole. In the future, according to the design specifications of the scaffolding, the inner and outer poles are set at equal distances.

4. The first step of construction should extend for the building and finally coincide with the first facade. After the pole is erected, there should be a temporary tie or diagonals

Support protection, do not operate on, causing the scaffold to collapse and hurt people.