① Check every half month to see if the scaffolding is fastened and the safety net is damaged, and a written record should be made.
② Clean up the construction waste on the frame once every half month, keep the construction site civilized, and do not throw the components directly on the ground during cleaning.
③. Check the verticality and integrity of the frame body, and observe the bearing conditions of the vertical pole and bottom.
④ Prevent snow accumulation in snowy weather.
⑤ The company’s safety function checks the frame and implements the experimental collection system.
⑥. The used materials are returned to the warehouse in time and stored in categories.
Post time: Sep-09-2020