(1) The use load must meet the following requirements
① The load on the work surface (including scaffolding boards, personnel, tools, and materials, etc.), when there is no regulation, the structural scaffolding shall not exceed 4KN/m2, the decoration scaffolding shall not exceed kN/m2; the maintenance scaffolding shall not exceed 1kN/m2.
②The load on the working surface should be evenly distributed to avoid excessive loads being concentrated together.
③The number of scaffolding layers and simultaneous working layers of the scaffolding shall not exceed the regulations.
④The number of paving layers and load control of the transfer platform between the vertical transportation facilities (Tic-Tac, etc.) and the scaffolding shall not exceed the requirements of the construction organization design, and the number of paving layers and excessive stacking of construction materials shall not be arbitrarily increased.
⑤ Lining beams, fasteners, etc. should be installed along with the transport and must not be stored on scaffolding.
⑥Heavier construction equipment (such as electric welders, etc.) shall not be placed on the scaffold.
(2) Do not arbitrarily dismantle the basic components of the tripod and connecting wall parts, and do not arbitrarily dismantle the various safety protection facilities of the tripod.
(3) Basic rules for the correct use of scaffolding
① The materials on the working surface should be cleaned up in time to keep the working surface tidy and unobstructed. Do not place tools and materials randomly, so as not to affect the safety of the operation and cause falling objects and hurt people.
②Every time the work is closed, the materials on the shelf are used up, and the unused ones should be stacked neatly.
③When performing operations such as prying, pulling, pushing, and pushing on the working surface, take the correct posture, stand firm or hold firm support, so as not to lose stability or throw things out when the force is too strong.
④ When conducting electric welding operations on the work surface, reliable fire prevention measures should be taken. (Detailed view: Fire protection requirements and measures for scaffolding)
⑤When working on the shelf after rain or snow, the snow and water on the working surface should be removed to prevent slipping.
⑥ When the height of the working surface is not enough and it is necessary to raise it, a reliable method of heightening shall be adopted, and the height of the height shall not exceed 0.5m; when it exceeds 0.5m, the paving layer of the shelf shall be raised according to the erection regulations.
⑦ Vibrating operations (rebar processing, wood sawing, placing vibrators, throwing heavy objects, etc.) are not allowed on the scaffold.
⑧No wires and cables shall be pulled on the scaffold without permission, and no open flame shall be used on the scaffold.
Post time: Sep-23-2020