Requirements for erecting industrial scaffolding

1. Before the scaffolding is constructed, a special construction plan should be prepared according to the actual situation of the building structure, and it should be implemented only after review and approval (expert review);
2. Before the installation and dismantling of the scaffolding, the safety and technical instructions should be given to the operators according to the requirements of the special construction method:
3. The quality of the scaffolding structure accessories entering the construction site should be re-inspected before use, and unqualified products shall not be used;
4. The components that have passed the inspection should be classified and stacked according to the type and specification, and the quantity and specification should be marked. The drainage of the component stacking site should be unobstructed and there should be no accumulation of water;
5. Before the scaffolding is erected, the site should be cleaned and leveled, the foundation should be solid and uniform, and drainage measures should be taken;
6. When the scaffolding wall connection parts are set up in a pre-buried manner, they should be pre-buried according to the design requirements before the concrete is poured, and a hidden inspection should be carried out.