1. Design approval and construction
The erection and construction of scaffolding must be the responsibility of the enterprise construction management team, and the construction technicians must hold a special work permit for building climbing and erection. When choosing to set up a plan, it is necessary to determine the type of scaffolding, the form and size of the frame, the basic support plan, and the anti-knot and wall attachment measures according to the characteristics of the shape in the plane layout of the engineering structure. In the research and design of the construction of lifting scaffolding, strict requirements must be placed on the relevant standards of the control system. Because the risk correlation coefficient of high-rise operations is higher than that of scaffolding on ordinary floors.
2. Strengthen the inspection and safety management of scaffolding
Strengthening the inspection, acceptance, and safety management of scaffolding is an important link in the later safe use. Once quality problems are found, they should be replaced immediately. Most scaffolding accidents are caused by failure to conduct regular inspections, and failing to resolve potential accidents and accidents. Strengthen the quality and safety control of scaffolding steel pipe fasteners at the construction site, mainly from the procurement and production sources, recycling and distribution processes, maintenance, and scrapping links. Construction design, on-site safety inspection management, and construction approval should be pro-ceduralized and institutionalized.
The disc-type scaffolding has reasonable disc spacing, and flexible coordination, and can be used with an adjustable top support base to support bridges of different spans and various cross-sections. The traditional cast-in-place box beam formwork comes with a support system, which is bulky and can only be used for special beam types. It has great disadvantages and is inconvenient for workers to use and is not very firm. The new disc-type formwork system is light weight, has a large connection plate distance, less physical exertion for workers, and saves labor costs. Moreover, the entire disc-type scaffolding can be hoisted and dismantled as a whole, and with reasonable coordination with the hoisting belt, it is more convenient to use and more comfortable to work.
Post time: Jun-24-2024