  • The floor-standing scaffolding construction method

    The construction of floor-standing scaffolding starts directly from the ground or floor surface. Its bearing capacity is large and the shelf is stable and not easy to loosen and tilt. It can not only be used for structural engineering construction, but also decoration engineering construction; Co...
    Read more
  • When will scaffolding be inspected

    1. After the scaffolding foundation is completed before the frame is erected. 2. After every 6-8m height is erected. 3. Before applying load on the working layer. 4. After reaching the design height or encountering winds or heavy rains of level 6 and above, after the frozen area is thawed. 5. Ina...
    Read more
  • The most direct cause of scaffolding accidents at the construction site

    The construction site is the most direct cause of scaffolding accidents. It is whether the scaffolding workers have set up and strengthened the scaffolding in place. The first is the erection of scaffolding, whether it conforms to the specifications, sweeping poles, scissor braces, spacing betwee...
    Read more
  • Scaffolding scissor brace setting points

    First, the principle of setting the horizontal scissors 【normal type】 ① Set horizontal scissor support at the top; ②When the erection height exceeds 8m or the total construction load is greater than 15KN/㎡ or the concentrated line load is greater than 20KN/m, the top and bottom scissor braces ...
    Read more
  • Summary of safety inspection points for floor-mounted scaffolding

    First, the inspection points of the construction plan 1. Whether there is a construction plan for the scaffolding; 2. Whether the height of the scaffold exceeds the specification; 3. No design calculation or approval; 4. Whether the construction plan can guide the construction. Second, the inspec...
    Read more
  • Fastener-type steel pipe scaffolding

    1. Pole erection The distance between the poles is about 1.50m. Due to the shape and use of the building, the distance between the poles can be adjusted slightly, and the distance between the poles is 1.50m. The net distance between the inner row of vertical poles and the wall is 0.40m, and the n...
    Read more
  • Scaffolding removal

    The dismantling procedure of the shelf should be carried out step by step from top to bottom. First, remove the protective safety net, the scaffolding board, and the wooden row, and then remove the upper fasteners and connecting rods of the cross cover in turn. Before removing the next scissor br...
    Read more
  • Details of the scissor braces and transverse diagonal braces of the scaffolding

    (1) The scissor braces should be set continuously from bottom to top from the bottom corner of the scaffold, and the surface of the scissor braces should be painted with red and white warning color paint. (2) The number of spanning poles for each scissor brace shall be determined as specified in ...
    Read more
  • What are the precautions for scaffolding construction

    1. During the construction of the scaffolding, it is necessary to check whether its fasteners are tightened to ensure that it is in a safe state during the erection process. The erection personnel must wear safety belts, safety helmets, safety ropes, and safety gloves. During the erection process...