Important parts for scaffolding acceptance

1) Whether the setting and connection of the scaffolding rods, the structure of the connecting wall parts supports, and door opening trusses meet the requirements.

2) Whether there is water in the foundation, whether the base is loose, whether the pole is suspended, and whether the fastener bolts are loose.

3) For double-row and full-hall scaffolding with a height of more than 24m, and full-hall support frames with a height of more than 20m, whether the settlement and verticality deviation of the vertical poles meets the technical specifications.

4) Whether the safety protection measures for the scaffolding body meet the requirements.

5) Whether the scaffolding is overloaded.


Post time: Oct-11-2023


We use cookies to offer a better browsing experience, analyze site traffic, and personalize content. By using this site, you agree to our use of cookies.

Accept