How to properly remove the scaffold during construction

1. Preparatory work before scaffolding is established for revocation of scaffolding: check the scaffold comprehensively, check the key points to check whether the fastener connection and fixing, support system, etc. can meet the safety requirements; prepare the revocation plan based on the check results and site conditions and have and partially agree; intermittent skills Confession; according to the circumstances of the revocation site, set up fences or alert signs, and have special personnel to guard them; clear out the data, wires and other debris remaining in the scaffolding.

2. Cancel the working area of the shelf to prevent non-operators from entering.

3. Before removing the rack, the person in charge of the construction should agree to the procedures. When disassembling the rack, a superior person must be instructed to take care of the upper and lower sides and coordinate the actions.

4. The order of revocation should be that the components erected later should be removed first, and the components erected first should be removed later to prevent the use of toppled or pulled down revocation methods.

5. Fixing parts should be suspended layer by layer along with the scaffolding. When the concluding section of the riser is suspended, the fixing parts and supports should be detached first after temporary support is installed.

6. The suspended scaffold components should be taken to the air in time to prevent throwing from the air.

7. Scaffolding parts transported to the air should be cleaned and maintained in time, painted with anti-rust paint as required, and stored in storage according to types and specifications.