1. Arrange a special person to review the scaffold every day to see if the uprights and pads are sinking or loose, whether the fasteners of the frame are sliding or loose, and whether the components of the frame are intact;
2. It is strictly forbidden for anyone to dismantle any parts of the scaffold at will;
3. The scaffold that has been erected cannot be changed without approval. All changes to the scaffold must be made by a qualified scaffolder;
4. It is not allowed to drill holes or weld on the frame rods, fasteners and foot-board frames, and bent pipe fittings cannot be used;
5. Safety fences and warning signs should be set up on the job site to prevent non-operating personnel from entering the hazardous area;
6.When setting up and removing scaffolding, fences and warning signs should be set up on the ground, and special personnel should be sent to guard against non-operating personnel.
Post time: Jun-10-2020