The attached lifting scaffold refers to an external scaffold with anti-overturning and anti-fall devices (also known as a “climbing frame”) that is erected at a certain height and attached to the engineering structure. ). The attached lifting scaffold is mainly composed of the attached lifting scaffold body structure, the attached support, the anti-tilt device, the anti-fall device, the lifting mechanism, and the control device. specific difference
1. Materials: The floor-standing double-row steel scaffolding uses steel pipes, buckles, and other erection materials and consumes a lot of materials; the consumption of the climbing frame is only 10% of the comprehensive frame.
2. Labor: When erecting and dismantling the floor-standing double-row steel scaffolding, not only is the operating environment dangerous, labor-intensive, but also labor-intensive; the operating environment is good when the climbing frame is lifted and lowered, and the labor intensity of workers is low, and the labor-consumption is 50% lower than that of the comprehensive frame. %about.
3. Safety: The floor-type double-row steel scaffolding is prone to accidents during the erection and dismantling process, and the safety is poor; the climbing frame is equipped with multiple protections such as anti-fall, anti-overturning devices, and synchronous fault monitoring, which is highly safe.
4. Civilized construction: During the entire construction process of the floor-standing double-row steel scaffold, a large number of materials are continuously transported in and out, up and down, and the sundries under the scaffold are difficult to clean up, occupying the construction site, and the maintenance of the safety net is relatively large; Occupying the construction site, the entire building facade is fresh and clean.
5. Progress: The floor-standing double-row steel scaffold can only meet the construction requirements if the erection materials are supplied on time; the climbing frame has a fast lifting speed, which can raise or lower one floor in about two days, and does not occupy a tower crane, which is helpful To speed up the overall progress of the construction period.
6. Inspection and maintenance: The inspection and maintenance of the floor-mounted double-row steel scaffolding require a large amount of work. One-time inspection is labor-intensive and the cycle is long;
7. Use with external wall formwork: The floor-standing double-row steel pipe scaffold can only be used to support the formwork; the climbing frame is specially designed and equipped with additional configuration, and the formwork can be carried when lifting, and the external wall formwork can not be dropped.
8. Material platform erection: The floor-standing double-row steel scaffolding has a large number of erections, and the cost is high; the climbing frame erected in a small number, can be raised and lowered with the shelf, and the cost is low.
9. Other aspects: The floor-standing double-row steel scaffolding can generally be used for more than 10 years, but the fasteners and bolts are replaced every 3 years; the climbing frame can also be used for more than 10 years, but the electric equipment needs maintenance. In addition, both can meet the construction of glass curtain walls and outdoor pipes.