A complete guide to industrial scaffolding acceptance

1. First, the project manager must organize a team, including the heads of various departments such as construction, technology, and safety, to participate in the acceptance. The scaffolding must be erected and accepted in sections according to technical specifications, construction plans, and other documents to ensure that each step meets the requirements.

2. During the erection process, many key nodes need to be checked. For example, after the foundation is completed before the scaffolding is erected, and after each floor height is erected, you must stop and check.

3. After the scaffolding is erected to the designed height or installed in place, it must be fully inspected. The quality of materials, erection site, supporting structure, frame quality, etc. must all be carefully checked to ensure that there is no room for error.

4. During use, the status of the scaffolding must also be checked regularly. The main load-bearing rods, scissor braces, and other reinforcement rods must be checked, and the safety protection facilities must also be checked to see if they are complete and effective.

5. If you encounter special circumstances, such as after bearing accidental loads or encountering strong winds, you must check and record them in time to ensure the safety of the scaffolding.