Petikan
Tidak. | ItemPenerangan | Foto | Spesifikasi | Berat | Kuantiti(PCS/20GP) | FOB Tianjin | Remakr |
Kg/pc | USD/Piece | ||||||
1 | Bs1139 drop forged double couplr | | 48.3*48.3mm | 0.98 | 27,000 | $ 0.996 | |
2 | Bs1139 drop forged swive l coupler | | 48.3*48.3mm | 1.15 | 23,000 | $ 1.150 | |
3 | Bs1139 ditekan lengan couplr | | 48.3mm | 1.00 | 26,500 | $ 0.947 | |
1: 7.20;
| |||||||
4 | BS1139 Drop Forged Board Retaining Couplr | | 48.3mm | 0.63 | 42,000 | $ 0.670 | |
| |||||||
5 | BS1139 Drop Forged Putlog Coupler | 48.3mm | 0.63 | 42,000 | $ 0.670 | ||
6 | BS1139 Drop Forged Girder/Beam Coupler | | 48.3mm | 1.50 | 17,650 | $ 1.595 | |
7 | BS1139 Drop Forged Ladder Clamp | | 48.3*48.3mm | 0.68 | 39,000 | $ 0.802 | |
Jumlah: | 217,150 |
Catatan:
- Harga adalah berdasarkan kuantiti dan ucapan pesanan di atas.
- Pembungkusan: Pembungkusan pengeksport standard, sesuai untuk pengangkutan laut.
- Tempoh Pembayaran: TT 30% Advace, Baki Aganis dengan Dokumen BL.
- Kualiti/Toleransi: Ia mematuhi standard BS1139/EN39.
- Waktu Penghantaran: 20-30 Hari bekerja setelah menerima pembayaran terlebih dahulu
- Kesahan harga: 3 hari.
Masa Post: Jun-17-2024