I. Materials debet esse C% inspectis a current nationalibus signa. Omnes scaffolding materiae oportet esse proprie reposita postquam inspici et qualified et necesse habent productum qualitas libellorum, productio licenciis, et test refert from professional testis unitates.
II. Salus praesidio apparatu et mensurae apparatu sunt completum.
III. Post specialem constructionem consilium ad page erectionem summitto per generali redemptore ad Project Department of Party A Transierunt, in constructione unitas erit ordinata ad mores technica disclosure et scripsit records de disclosure.
IV. Ideo operatoring debet certified ad opus.
5. Drawing deepening: According to the special plan for scaffolding erection drawings, check with the building construction drawings, calculate the step and horizontal distance of the vertical poles, and draw the vertical pole layout positioning diagram and the cantilever unloading layer cantilever steel beam layout diagram.
VI. Foundation Requirements: Usus Concrete Hardeninging curatio, concretum crassitudo ≥100mm, concretum gradu ≥c20, oportet obviam onus requisitis ad pegionem erectionem Construction Construction Construction Construction, et layout secundum verticem poli layout positioning diagram.
VII. Drainage fossas sunt circum fundamenta, et non est aqua cumulus super fundamentum terram. Fusce fundo ex 40mmх4mm galvanized plana ferro coniuncta pelagus polus duo fulmine fibulis. Fulgur praesidio puncta sunt ≥ quattuor (fulgur praesidio puncta sunt in quattuor angulis aedificii) et requisita fulgur praesidio specialem consilium occurrit ut efficacius fulgur praesidium.
VIII. Verticalis et horizontalem verrere virgas: vertical verticem virga fixum columna 20cm ab imo basi rectum angulus fastener et verticalis verticem virga fixum angulus fastener. In introitu et exit ex transitu, et verrere virga possit installed cum sit periculum est tripping.
IX. Columnae in articulis duo columnas non apparent in eodem tempore simul et distantiam moverentur in altitudine directionem non minus 500mm.
X. Et spatio horizontalem inter adjacent articulis longitudinalis, non minus 500mm et distantia inter se iuncturam et columna non plus 500mm. Articularum moverentur non synchroni et in eadem.
XI. Et extensio diametro virga axicta ue est overlapped in fasteners. Longitudo non minus quam 1m et non minus quam III fasteners.
XII. Duo parva crossbars debet poni sub articulis de pegmas tabulas capite ad caput et tabulas fines sunt 100-150mm a parva crucis vectes.
XIII. Et overlapped tabulas in parva crucis vectes et longitudinem longitudinem non minus 200mm. Pegaffaning tabulas ad flectit esse transversum et Longitudo longitudinem articulorum A≥100mm, l≥200mm et singulis tabulata tabula ligatum ad quattuor puncta.
XIV. Pegaffolding continue set axicia capreolis collocatae totius longitudinis et altitudo exteriori latitudine.
XV. Quod spatium postulationem centrum puncta cuiusque fastener in pelagus nodi: a≤150mm. (I. II verticalis polus II. Longitudinal horizontalis polus III. Transversus horizontalis polus IV. Shear ue)
XVI. Murus nexum adoptat rigidum nexu et posuit in duos gradus et tres palmorum, sed murus conexio polus coverage regio oportet ≤27m2. Φ20 ferro vectes sunt embedded ex parte structural concretum. Et embedded longitudinem et welding width de ferro vectes oportet obviam onus requisita specialis ratio. Murus nexu polus propius pelagus nodi distantiam a pelagus nodi ≤300mm.
XVII. Rudis materia requisita pro filum funem unloading embedded partes: uti per ferro cum diameter ≥Φ20. Commendatur uti embedded nucem convenerunt in partes. Et embedded longitudinem est in occursum onus requisita specialis ratio.
XVIII. Installation Requirements pro filum funem unloading embedded partes: quod est stricte prohibetur ad coniungere unloading filum funem cum concreto non XXVIII diebus antiquis in extra embedded situ structural trabem. Nefas usu filum funem unloading embedded partibus: et embedded partes sunt installed in superficiem structurarum trabem, relinquens Leakage metus ad exteriorem murum constructione.
XIX. Requisita pro rudis materiae cantilever onus embedded partes: uti per ferro cum diameter ≥Φ20, et quod stricte prohibetur ad usum fila ferro. Et embedded longitudinem est in occursum onus requisita specialem consilium; Recta exercitia cantilever onus embedded partes: quod est stricte prohibetur ad weld et figere eos postea.
XX. Requirements for Pegaffded Wall partis: uti per ferro embedded partes cum diameter ≥Φ20 et plene studio eos cum pegmas. Est stricte prohibetur ad usum threaded ferro pro embedded partes. Et embedded longitudinem et welding longitudinem oportet onus requisitis specialem consilium; Est suadetur ut ad connexionem modum embedded ferro laminam nuces. Falsa exercitia forfice embedded murum partes embedded partes installed super superficiem structurarum trabem relinquens leakagium metus exteriori constructione.
XXI. Requirements ad cantilever unloading occasus: cantilever ferro trabibus uti ≥16 I-trabes et altitudo et ego trabem cantilever frame (sine filum funem unloading) non excedat 24m; Si altitudinis excedit 24m, oportet esse specialis unloading consilium, quae non solum potest implemented post confirmationem a supervisor et pars A.
XXII. Requirements pro elevator foramen guardrails: Guardrail Altitudo ≥1.6m, vertical Steel Bar Stracing ≤100mm, vexillum area et admonitio verba in summo, 180mm alta skirting tabulam, in intus, humilis-intentione est in eo installed intus in intus elevator est in eo installed in intus elevator est in intus intus in intus elevator est in intus intus in intus in intentione.
XXIII. Requisita Stair Custrails Removibilibus aquae Pipe Guardrails, Altitudo ≥1.2m; Similitudinem tribunalis cum gutta de magis quam 3m in extremis oportet esse suspenderunt cum reticulum et 180mm princeps skirting tabula installed in fundo, skirting tabulas factum de ≥9mm densissima plywood.
24. Requirements for closed protection of floor openings with a length and width of ≥400mmх400mm: Φ6@150 steel mesh is fixed in the opening with four-point expansion screws, the surface is sealed with ≥10mm thick plywood, and the edges are covered with 200mm of pressure edge and then sealed with mortar.
XXV. Postulationes pro clausis tutela area foramina cum longitudo et latitudo minus quam 400mmх400mm, fixa cum 10mm densissima plywood et notatum oculi-apprehensa pingunt.
XXVI. Requirements pro ore gladii, uti amotibiles aqua pipe guardrails cum altitudine 1.2m. Post installation, pendet salus retia praesidium. Install 180mm alta skirting tabulas in fundo. Et skirting tabulas fiunt de ≥9mm densissima plywood.
XXVII. Requirements pro profecta fundum retia, set a profundo rete pro omnibus III contignationibus, install 180mm alta skirting tabulas in fundo, et skirting tabulas fiunt de ≥9mm densissima plywood.
XXVIII. Requirements pro occasum clausa scaffolds: quod materia est 10mm densissima plywood, set dura clausa tutela pegmas tabula pro omnibus VI contignationibus, install 180mm alta tabulata ad fundo, et in skirting boards sunt de Raards Plywood.
XXIX. Requirements pro Foundation De Foundation Pit Coscu, Usus amovibilibus aquae pipe guardrails cum altitudine 1.2m et pendet salus retia tutela. Install a 180mm alta skirting tabula in fundo. Et skirting tabulam factum est de ≥9mm densissima plywood. Est suadetur ut a concreto anti-fastigio skirting tabula.
XXX. Requirements ad occasum de custodia non potest clausus cum Plywood: Usus amotibiles aqua pipe guardrails summa ≥1.2m; Si ripam excedit, install a 180mm alta skirting tabula in fundo. Et skirting tabulam factum est de ≥9mm densissima plywood.
XXXI. Requirements ad occasum tutum locis: quod materia est 10mm densissima plywood et geminus-iacuit plywood dura clausa praesidium est. Altitudo pedestri locus layer est ≥2 m.
XXXII. Requirements ad occasum de tutela effuderit in coverage regio Turrim Pulchra translationem: quod materia est 10mm densissima plywood dense posuit, et geminus-iacuit plywood durum clausa praesidium.
XXXIII. Installation Requirements: quod materia est ≥9mm densissima plywood, 180mm altum, et skirting tabulas oportet set in se areæ; Et skirting tabula est inter verticalem poli et salus rete.
XXXIV. Rudis material requisita pro constructione scalas: ferro tibiae, ferro reticulum calcamus aut ferro laminam gradiens, 5mm densissima plywood skirting tabulas; Construction scalas requisita: Tread Width 300mm, width width ≥1000mm, quieti platform width ≥1000mm, skirting tabulas altitudo 180mm, fastigio sit I: III, altum 1.2m.
35. Requirements for raw materials of the integral prefabricated unloading platform: the outer periphery of the chassis frame is ≥[18 channel steel, the middle is ≥[12 channel steel, the bottom plate, and side plates are ≥3mm thick patterned steel plates, the lifting rings are ≥20mm thick steel plates, the four corner columns of the fence and the middle columns and horizontal Vectes de superioribus hircorum omnes ф48 × 3.5 ferro fistularum et ferro filum funes sunt ≥Φ18.5 × IV;
Requirements ad vestigium integralis prefabricated unloading suggestu: postquam inter se installation, id est accipiendum a vigilantia comitatu antequam potest esse in usu, et scriptum recordum cuiusque acceptatio debet esse factum. Pondus terminum signum utitur "stulti style" pondus terminum signum. Stacking altitudo excedat altitudinem unloading Guardrail; Cum stacking ferro fistularum externae ex unloading platform non excedat 1/4 totalis longitudinem ferro pipe;
Requirements ad erectionem integralis prefabricated unloading suggestu: et communem redemptore debet providere specialem consilium ante usum, et lateralis pressura resistentia de maledicto occurrat in requisita stacking fistularum. Salus elementum non minus quam II, et non potest implemented post confirmationem a supervisor et pars A.
XXXVI. Requirements ad constructionem transitus ad commutandam turrim gregis, uti a fastener-genus aqua pipe guardrail cum altitudine 1.2m. Post installation, pendent salus rete pro praesidio. Install a 180mm alta skirting tabula in fundo. Et skirting tabulam factum est de ≥9mm densissima plywood.
XXXVII. Requirements ad constructionem viatoribus et Suspendisse elevator transitus: Usus 10mm densissima plywood ponere proxime ad imo et uti externa cincinno praesidio defensiva ostium.
XXXVIII. Tractus longitudinem transeunte et Suspendisse elevator transitus fulmine est ≥150mm, ferrum laminam in medio viatoribus et Suspendisse attollo ferrum ostium signatum cum latitudinem 300mm et inferior signatus cum latitudine signati.
XXXIX. Requirements ad occasum cantilever plana Baffles et inclinata Backles: quod materia est 10mm densissima plywood et geminus-iacuit durum clausuram est posuit; Est prohibitus ad usus transparent materiae ad Agricola. Quod commune redemptore debet providere specialem consilium, quod potest esse implemented post confirmationem a supervisor et pars A. iniuriam usu duplici-iacuit praesidio: Double-iacuit praesidio non utitur durum, et Bamboo Poles sunt usus pro 10mm densissima Plyer.
XL. Drainage fossa occasum in fundo cantilever platform: aedificia exteriori murum ostentationem necessitates oportet instructi gilvanized ferrum INCILE fosch gutters. Quod communia redemptore debet providere specialem consilium, quod potest implemented solum post confirmationem per praefectum et Party A.
XLI. Requirements ad erectionem deficit in operantes iacuit: altitudo pegitant super superficiem superficies est ≥1.8m.
XLII. Postquam erectio singulis iacuit de pegmata perficitur, oportet esse auto-inspici a constructione unitas et nuntiavit ad vigilandum comitatu pro acceptatione ante area trabem deorsum potest esse installed, et scriptum records cuiusque acceptatio potest esse custodiri, et scriptum records cuiusque acceptatio potest servanda, et scriptum records cuiusque acceptatio potest esse custodiri, et scriptum records singulis acceptatio potest esse custodiri.
XLIII. Salutare Monitum Requisita: Per erectionem et Dismantling de pegma, oportet esse salus officer reus totius processus in admonitionem, et non relinquere locum medium. Non-pegeffolding operarios prohibitus ab ingressu salutis monitionem regio. Si salus officer vel custodia relinquit locum medium, constructione non licet.
XLIV. Monitum area est segregatur per salutem ferrum equos et specialis persona est reus ad admonitionem. Et non relinquam locum medium. Si salus officer vel custodia relinquit locum medium, constructione non licet.
XLV. Principium Dismantling pegi est ad erigendum primum et tum Dismantle, et Dismantle primum si erecta postea; comprehendendo reprehendo an fastener connexionem, murum connexionem, subsidium system, etc of page ad occursum structural requisitis; Dismantling Sequentia et mensuras superiorum in pegmas Dismantling constructione consilium debet esse suppleed et improved secundum ad inspectionem results, et non potest implemented nisi post approbationem per project Department of Party A; Ante Dismantling pegma, obstantia in page et impedimenta super terram debet.
XLVI. Murus connexionem debet esse dismantled layer per iacuit cum pegma. Stricte prohibetur Dismantle muro connexionem iacuit vel plures stratis ante derisum pegma; Altitudo differentia segmented dismantling non maius quam II gradus. Si altitudo differentia maior quam II gradus additional murus connexionem partium debet addidit supplementum.
XLVII. Cum pegmata segmatur, duo fines de pegmata, quae non dismantled clausis tutela utrinque et muro iunctio virgis additur secundum necessitates specialem consilii. Quod commune redemptore debet providere specialem consilium, quod potest implemented post confirmationem per praefectum et Party A.
XLVIII. Cum pegmata est separata sectiones (ut positionem viatoribus et Suspendisse attollo retinetur), duo fines peginas, qui non daturum et protected et murum connectens et adiungetur a rebus speciali consilii. Quod communia redemptore debet providere specialem consilium, quae non solum potest implemented post confirmationem per praefectum et Party A.